Home additions are what we do. For over 20 years, we have proudly designed and built thousands of beautiful home extensions in Toronto and the GTA. Whether you're looking to expand a single room or add another floor, we’ll work closely with you, ensuring a result that exceeds your expectations.
Transform Your Space Without Moving - Expand, Enhance, and Enjoy Your Home.
When space is running low in your home, you have several options. Scroll to see where each one goes on the house, what it involves and what it typically costs.
0 / 6The house today
Start here
A typical Toronto house and lot
Much of Toronto and the GTA was built as bungalows and storey-and-a-half homes on narrow lots. Most of the space you need can be found on the lot you already own.
Scroll to see each way the house can grow.
1 · Build up
Second-storey addition
The roof comes off, a full new floor is framed on top of your existing walls, and a new roof goes on. Often called a bungalow top-up, it can double your living space without giving up any yard.
Typical size
600 – 1,200 sq ft
Typical cost
$350 – $550 / sq ft
Construction
6 – 8 months
Best for
Bungalows and 1½-storey homes
Adding 2 to 4 bedrooms and a bathroom
Tight lots with no room to build out
In Toronto: Zoning sets the maximum height and floor area for your lot, and a structural engineer confirms that the existing foundation and walls can carry the new floor before design starts.
The house extends into the backyard on a new foundation, one or two storeys high. It is the usual way to get a larger kitchen, a family room or a main-floor bedroom.
Typical size
200 – 600 sq ft
Typical cost
$300 – $450 / sq ft
Construction
3 – 6 months
Best for
A bigger kitchen or family room
Main-floor bedroom or in-law space
Homes with a deep backyard
In Toronto: The rear-yard setback and lot coverage rules decide how far back you can go. The new foundation is dug below the frost line and tied into the existing house.
An enclosed porch, a proper entry and mudroom, or a front extension that also gives the house a new face from the street.
Typical size
60 – 250 sq ft
Typical cost
$300 – $450 / sq ft
Construction
2 – 4 months
Best for
A real front entry or mudroom
Covered or enclosed porches
Updating how the house looks from the street
In Toronto: Front-yard setbacks are often tied to how far back the neighbouring houses sit, so the allowed depth is checked early. Small additions tend to cost more per square foot because fixed costs are spread over less space.
An attached garage, a room over the garage, or a side extension that widens the main floor. A garage shell sits at the low end of the range and finished living space at the high end.
Typical size
250 – 600 sq ft
Typical cost
$200 – $450 / sq ft
Construction
3 – 5 months
Best for
Attached garages and workshops
A bedroom or office over the garage
Wider lots and corner lots
In Toronto: Side-yard setbacks are tight on most city lots, so side additions often need a minor variance from the Committee of Adjustment before the building permit.
A glazed room off the back of the house. A four-season sunroom is built like any other addition, with a foundation, insulation and heating, so it is comfortable in January.
Typical size
120 – 300 sq ft
Typical cost
$250 – $380 / sq ft
Construction
2 – 3 months
Best for
A bright sitting or dining room
A view of the garden all year
Smaller budgets and shorter builds
In Toronto: Sunrooms need a building permit in Toronto, and they count toward your lot coverage like any other addition.
Foundation & framingExcavation, concrete, framing, roof structure37%$150,000
Exterior shellRoofing, windows, brick or siding18%$73,000
Mechanical rough-insPlumbing, electrical, heating and cooling13%$53,000
Interior finishesInsulation, drywall, floors, trim, kitchen and bath27%$109,000
Planning ranges based on pricing published by GTA builders in 2026, before HST. Set aside a further 10–15% as contingency for what an older house may reveal. Your actual price depends on your house, your lot and your selections.
One team takes the project from the first visit to the final inspection. Select a step to see what happens, how long it takes and how much of the budget is spent there.
Month 12345678910
Shown for a typical second-storey addition. A ground-floor addition is usually two to three months shorter.
Step 1 of 8 · Week 1
Free consultation
We visit, listen to what you need and tell you honestly what fits your house, lot and budget.
Your part: Tell us what is not working. A rough wish list helps.
No cost at this step
0% of the budget spent by the end of this step
Step 2 of 8 · 1 – 2 weeks
Zoning & feasibility
We check what zoning allows on your lot (height, setbacks, coverage, floor area) and how sound the house is, so you know what can be built.
Your part: Share your property survey if you have one.
No cost at this step
0% of the budget spent by the end of this step
Step 3 of 8 · 4 – 8 weeks
Design & fixed budget
Our designers draw the plans with you and price them as they go, so the design and the budget match.
Your part: Review the layout, pick finishes, approve the design and budget.
3% of the budget is spent in this stepabout $9,250 – $11,000
3% of the budget spent by the end of this step
Step 4 of 8 · 2 – 8 weeks
Permits & approvals
We prepare the drawings and apply for the building permit. If a minor variance is needed, add 2 to 4 months.
Your part: Nothing. We deal with the City.
3% of the budget is spent in this stepabout $9,250 – $11,000
5% of the budget spent by the end of this step
Step 5 of 8 · 6 – 10 weeks
Foundation & framing
Site protection, excavation and concrete for anything new at ground level, then the floors, walls and roof structure are framed. On a second storey this is when the old roof comes off and the house is kept weather-tight.
Your part: Walk the framed space with us before anything is closed in.
37% of the budget is spent in this stepabout $136,900 – $162,800
42% of the budget spent by the end of this step
Step 6 of 8 · 6 – 10 weeks
Exterior & rough-ins
Roof, windows and siding close it in. Plumbing, wiring and heating go in. City inspectors check each stage.
Your part: Confirm where switches, outlets and lights go.
31% of the budget is spent in this stepabout $114,700 – $136,400
73% of the budget spent by the end of this step
Step 7 of 8 · 8 – 12 weeks
Interior finishes
Insulation, drywall, floors, trim, cabinets, tile and paint. The new space joins the old so it feels like one house.
Your part: Watch your finishes go in.
27% of the budget is spent in this stepabout $99,900 – $118,800
100% of the budget spent by the end of this step
Step 8 of 8 · 1 week
Final inspection & handover
The final inspection closes the permit. We walk through with you, fix anything on the list and hand over the keys.
Your part: Move in.
No cost at this step
100% of the budget spent by the end of this step
How an addition is built
1Foundation
Footings and foundation walls are poured below the frost line and waterproofed.
2Framing
Floors, walls and roof are framed in lumber and tied into the existing house.
3Roof & sheathing
The frame is sheathed and roofed, so the addition is closed to the weather.
4Windows & cladding
Windows go in and brick or siding goes on, while trades rough in the services inside.
5Finished
Insulation, drywall, floors and trim. The new space reads as part of the original house.
Local knowledge
Designed for Toronto and GTA lots
An addition here is shaped by the by-law, the lot and the age of the house as much as by the wish list. We plan for all three from the first visit.
01
Zoning comes first
Every lot has limits on height, setbacks and size. We check them first, so nothing is drawn that cannot be built.
02
Minor variances
If a design goes slightly past a zoning limit, the Committee of Adjustment can approve a minor variance. It usually takes 2 to 4 months.
03
Every addition needs a permit
Every addition, garage, sunroom and underpinning job needs a building permit. Review usually takes 2 to 8 weeks.
04
Narrow lots and shared walls
Semis and row houses share a wall, and many lots are under 25 feet wide. We plan access and the shared wall from day one.
05
Heritage homes
Designated homes and Heritage Conservation Districts need a heritage permit. Our heritage specialists design additions that fit the rules and the house.
06
Older houses
Many Toronto homes were built before 1960. We check the foundation and wiring up front, so the budget has no surprises.
Locations We Serve
Toronto
Scarborough
Vaughan
Thornhill
Aurora
Pickering
Oshawa
Barrie
Woodbridge
Concord
Brampton
Nobleton
Burlington
St. Catharines
Kitchener
North York
Etobicoke
Richmond Hill
Markham
Stouffville
Ajax
Newmarket
King City
Maple
Mississauga
Milton
Oakville
Hamilton
Niagara
Waterloo
Services
Explore Our Home Addition Solutions
Home additions offer a cost-effective way to expand your space without the hassle of moving. Whether for a growing family or enhanced functionality, an addition lets you stay in the home you love while meeting your changing needs.
When space is running low in your home, you have several options: build up, extend out, or dig under. Our team is our greatest asset, with designers who have the expertise and experience to create the perfect single-room, second-floor, or basement addition for your home.
Once you are satisfied with the design, our highly skilled building team will bring that vision to life. Because we offer design & build service, there is no disconnect between your ideas and the final result.
We take pride in helping our clients create the perfect home additions. Their feedback is a testament to our commitment to quality and personalized service.
We were very pleased with the homeadditions.ca contractors that did the work in our House. They were professional and did a job well done. From the design to dry wall to cabinetry to electrical and construction they helped create a space that we can enjoy for years to come.
Dan Parmon Markham
We couldn’t be happier with our home addition! The team was professional, communicative, and took the time to understand what we were looking for. New space feel like it was always part of our home, we are very happy!
Lisa M. Toronto
Questions
Home addition questions, answered
Something else on your mind? Call 647-277-4577 and ask us directly.
How much does a home addition cost in Toronto?
Most additions in Toronto and the GTA fall between about $300 and $600 per finished square foot in 2026. Second-storey additions sit at the higher end because of the structural work and the new roof; ground-floor additions and sunrooms are usually lower. The size, the finishes, kitchens and bathrooms, and the condition of the existing house all move the number. The estimator above gives a range; a site visit gives you a real one.
Do I need a building permit for an addition?
Yes. Every addition needs a building permit, including attached garages, sunrooms and basement underpinning. If the design exceeds a zoning limit such as height, setbacks or lot coverage, a minor variance from the Committee of Adjustment is needed first. We prepare the drawings and handle both applications.
How long does a home addition take?
Plan for design and permits first: typically 2 to 4 months, or longer if a minor variance is needed. Construction then runs about 3 to 6 months for a ground-floor addition and 6 to 8 months for a second storey.
Should I build up or build out?
Building up keeps your yard and suits bungalows on tight lots, but it costs more per square foot and affects the whole house. Building out is usually simpler and lets most of the house stay as it is, but it uses yard space and is limited by setbacks and lot coverage. We look at both for your lot and show you the cost and timeline of each.
Can we live in the house during construction?
For most rear, side and front additions, yes: the work is separated from the rest of the house until the new space is connected. For a second-storey addition, most families move out for at least the months when the roof is off.
Can my foundation support a second storey?
Often it can, sometimes with reinforcement. A structural engineer assesses the foundation and the existing walls before design begins, and any strengthening is included in the budget from the start.
My house is a heritage property. Can I still add on?
Usually, yes. The addition has to fit the house and stay below the original roof, and designated homes need a heritage permit. How heritage additions work
Do you handle design as well as construction?
Yes. One team designs and builds, so what you approve is what gets built.
Contact Us Today!
Need a Professional Builder?
Ready to Bring Your Home Vision to Life? Whether you’re looking to expand your living space, build a new addition, or completely remodel your home, our expert team’s here to help. Let’s work together to create the home of your dreams.
Tell us about your home A few details about the house and what you need.
We visit, free of charge We look at the house and the lot and talk through the options.
You get a design and a budget Drawn and priced by the same team that will build it.