Skip to content

Design & build · Toronto & the GTA

Home Additions Toronto

Home additions are what we do. For over 20 years, we have proudly designed and built thousands of beautiful home extensions in Toronto and the GTA. Whether you're looking to expand a single room or add another floor, we’ll work closely with you, ensuring a result that exceeds your expectations.

Transform Your Space Without Moving - Expand, Enhance, and Enjoy Your Home.

  • WSIB Ontario
  • HomeStars
  • Google Reviews
The same bungalow after a second-storey addition, with a covered front porch
A 1950s brick bungalow in Toronto with an aluminum door awning, before its addition
Before and after: a Toronto bungalow with a second-storey addition.
20+
Years of experience
100+
Completed projects
30
GTA cities served

Build up, extend out, or dig under

Six ways to add space to a Toronto home

When space is running low in your home, you have several options. Scroll to see where each one goes on the house, what it involves and what it typically costs.

  1. Start here

    A typical Toronto house and lot

    Much of Toronto and the GTA was built as bungalows and storey-and-a-half homes on narrow lots. Most of the space you need can be found on the lot you already own.

    Scroll to see each way the house can grow.

  2. 1 · Build up

    Second-storey addition

    The roof comes off, a full new floor is framed on top of your existing walls, and a new roof goes on. Often called a bungalow top-up, it can double your living space without giving up any yard.

    Typical size
    600 – 1,200 sq ft
    Typical cost
    $350 – $550 / sq ft
    Construction
    6 – 8 months

    Best for

    • Bungalows and 1½-storey homes
    • Adding 2 to 4 bedrooms and a bathroom
    • Tight lots with no room to build out

    In Toronto: Zoning sets the maximum height and floor area for your lot, and a structural engineer confirms that the existing foundation and walls can carry the new floor before design starts.

  3. 2 · Build back

    Rear addition

    The house extends into the backyard on a new foundation, one or two storeys high. It is the usual way to get a larger kitchen, a family room or a main-floor bedroom.

    Typical size
    200 – 600 sq ft
    Typical cost
    $300 – $450 / sq ft
    Construction
    3 – 6 months

    Best for

    • A bigger kitchen or family room
    • Main-floor bedroom or in-law space
    • Homes with a deep backyard

    In Toronto: The rear-yard setback and lot coverage rules decide how far back you can go. The new foundation is dug below the frost line and tied into the existing house.

  4. 3 · Build forward

    Front addition & porch

    An enclosed porch, a proper entry and mudroom, or a front extension that also gives the house a new face from the street.

    Typical size
    60 – 250 sq ft
    Typical cost
    $300 – $450 / sq ft
    Construction
    2 – 4 months

    Best for

    • A real front entry or mudroom
    • Covered or enclosed porches
    • Updating how the house looks from the street

    In Toronto: Front-yard setbacks are often tied to how far back the neighbouring houses sit, so the allowed depth is checked early. Small additions tend to cost more per square foot because fixed costs are spread over less space.

  5. 4 · Build out

    Side & garage addition

    An attached garage, a room over the garage, or a side extension that widens the main floor. A garage shell sits at the low end of the range and finished living space at the high end.

    Typical size
    250 – 600 sq ft
    Typical cost
    $200 – $450 / sq ft
    Construction
    3 – 5 months

    Best for

    • Attached garages and workshops
    • A bedroom or office over the garage
    • Wider lots and corner lots

    In Toronto: Side-yard setbacks are tight on most city lots, so side additions often need a minor variance from the Committee of Adjustment before the building permit.

  6. 5 · Bring in light

    Sunroom

    A glazed room off the back of the house. A four-season sunroom is built like any other addition, with a foundation, insulation and heating, so it is comfortable in January.

    Typical size
    120 – 300 sq ft
    Typical cost
    $250 – $380 / sq ft
    Construction
    2 – 3 months

    Best for

    • A bright sitting or dining room
    • A view of the garden all year
    • Smaller budgets and shorter builds

    In Toronto: Sunrooms need a building permit in Toronto, and they count toward your lot coverage like any other addition.

  7. 6 · Dig down

    Basement underpinning

    The basement floor is lowered and the foundation extended beneath it, in engineered sections, to turn a low basement into full-height living space.

    Typical size
    Whole basement
    Typical cost
    Quoted on site
    Construction
    2 – 4 months

    Best for

    • Older homes with low basements
    • A legal basement suite or rec room
    • Lots where you cannot build up or out

    In Toronto: Underpinning needs engineered drawings and a building permit. On semi-detached and row houses the shared wall needs particular care.

Budget

What a home addition costs in Toronto

Set the type, the size and the finish to see a realistic range for the GTA in 2026, and how that budget is divided across the work.

1 What are you adding?
2 How much space?
900 sq ft

About the size of three bedrooms and a bathroom.

3 What level of finish?

Estimated construction budget

$370,000–$440,000

$410 – $490 per sq ft6 – 8 months to build

Where the budget goes

  • Drawings & permitsDesign, engineering, permit fees5%$20,000
  • Foundation & framingExcavation, concrete, framing, roof structure37%$150,000
  • Exterior shellRoofing, windows, brick or siding18%$73,000
  • Mechanical rough-insPlumbing, electrical, heating and cooling13%$53,000
  • Interior finishesInsulation, drywall, floors, trim, kitchen and bath27%$109,000

Planning ranges based on pricing published by GTA builders in 2026, before HST. Set aside a further 10–15% as contingency for what an older house may reveal. Your actual price depends on your house, your lot and your selections.

Get an exact quote for this addition

Design to finish

How a home addition works, step by step

One team takes the project from the first visit to the final inspection. Select a step to see what happens, how long it takes and how much of the budget is spent there.

Shown for a typical second-storey addition. A ground-floor addition is usually two to three months shorter.

Step 1 of 8 · Week 1

Free consultation

We visit, listen to what you need and tell you honestly what fits your house, lot and budget.

Your part: Tell us what is not working. A rough wish list helps.

0% of the budget spent by the end of this step

How an addition is built

  1. 1Foundation

    Footings and foundation walls are poured below the frost line and waterproofed.

  2. 2Framing

    Floors, walls and roof are framed in lumber and tied into the existing house.

  3. 3Roof & sheathing

    The frame is sheathed and roofed, so the addition is closed to the weather.

  4. 4Windows & cladding

    Windows go in and brick or siding goes on, while trades rough in the services inside.

  5. 5Finished

    Insulation, drywall, floors and trim. The new space reads as part of the original house.

Local knowledge

Designed for Toronto and GTA lots

An addition here is shaped by the by-law, the lot and the age of the house as much as by the wish list. We plan for all three from the first visit.

  1. 01

    Zoning comes first

    Every lot has limits on height, setbacks and size. We check them first, so nothing is drawn that cannot be built.

  2. 02

    Minor variances

    If a design goes slightly past a zoning limit, the Committee of Adjustment can approve a minor variance. It usually takes 2 to 4 months.

  3. 03

    Every addition needs a permit

    Every addition, garage, sunroom and underpinning job needs a building permit. Review usually takes 2 to 8 weeks.

  4. 04

    Narrow lots and shared walls

    Semis and row houses share a wall, and many lots are under 25 feet wide. We plan access and the shared wall from day one.

  5. 05

    Heritage homes

    Designated homes and Heritage Conservation Districts need a heritage permit. Our heritage specialists design additions that fit the rules and the house.

  6. 06

    Older houses

    Many Toronto homes were built before 1960. We check the foundation and wiring up front, so the budget has no surprises.

Locations We Serve

  • Toronto
  • Scarborough
  • Vaughan
  • Thornhill
  • Aurora
  • Pickering
  • Oshawa
  • Barrie
  • Woodbridge
  • Concord
  • Brampton
  • Nobleton
  • Burlington
  • St. Catharines
  • Kitchener
  • North York
  • Etobicoke
  • Richmond Hill
  • Markham
  • Stouffville
  • Ajax
  • Newmarket
  • King City
  • Maple
  • Mississauga
  • Milton
  • Oakville
  • Hamilton
  • Niagara
  • Waterloo

Services

Explore Our Home Addition Solutions

Home additions offer a cost-effective way to expand your space without the hassle of moving. Whether for a growing family or enhanced functionality, an addition lets you stay in the home you love while meeting your changing needs.

One-storey rear home addition with glass doors onto a Toronto backyard
Home addition framing under construction behind a Toronto brick house

About

Home Additions Toronto

When space is running low in your home, you have several options: build up, extend out, or dig under. Our team is our greatest asset, with designers who have the expertise and experience to create the perfect single-room, second-floor, or basement addition for your home.

Once you are satisfied with the design, our highly skilled building team will bring that vision to life. Because we offer design & build service, there is no disconnect between your ideas and the final result.

About Us

Reviews

What Our Clients Are Saying

We take pride in helping our clients create the perfect home additions. Their feedback is a testament to our commitment to quality and personalized service.

Contact Us
We were very pleased with the homeadditions.ca contractors that did the work in our House. They were professional and did a job well done. From the design to dry wall to cabinetry to electrical and construction they helped create a space that we can enjoy for years to come.
Dan Parmon Markham
We couldn’t be happier with our home addition! The team was professional, communicative, and took the time to understand what we were looking for. New space feel like it was always part of our home, we are very happy!
Lisa M. Toronto

Questions

Home addition questions, answered

Something else on your mind? Call 647-277-4577 and ask us directly.

How much does a home addition cost in Toronto?

Most additions in Toronto and the GTA fall between about $300 and $600 per finished square foot in 2026. Second-storey additions sit at the higher end because of the structural work and the new roof; ground-floor additions and sunrooms are usually lower. The size, the finishes, kitchens and bathrooms, and the condition of the existing house all move the number. The estimator above gives a range; a site visit gives you a real one.

Do I need a building permit for an addition?

Yes. Every addition needs a building permit, including attached garages, sunrooms and basement underpinning. If the design exceeds a zoning limit such as height, setbacks or lot coverage, a minor variance from the Committee of Adjustment is needed first. We prepare the drawings and handle both applications.

How long does a home addition take?

Plan for design and permits first: typically 2 to 4 months, or longer if a minor variance is needed. Construction then runs about 3 to 6 months for a ground-floor addition and 6 to 8 months for a second storey.

Should I build up or build out?

Building up keeps your yard and suits bungalows on tight lots, but it costs more per square foot and affects the whole house. Building out is usually simpler and lets most of the house stay as it is, but it uses yard space and is limited by setbacks and lot coverage. We look at both for your lot and show you the cost and timeline of each.

Can we live in the house during construction?

For most rear, side and front additions, yes: the work is separated from the rest of the house until the new space is connected. For a second-storey addition, most families move out for at least the months when the roof is off.

Can my foundation support a second storey?

Often it can, sometimes with reinforcement. A structural engineer assesses the foundation and the existing walls before design begins, and any strengthening is included in the budget from the start.

My house is a heritage property. Can I still add on?

Usually, yes. The addition has to fit the house and stay below the original roof, and designated homes need a heritage permit. How heritage additions work

Do you handle design as well as construction?

Yes. One team designs and builds, so what you approve is what gets built.

Contact Us Today!

Need a Professional Builder?

Ready to Bring Your Home Vision to Life? Whether you’re looking to expand your living space, build a new addition, or completely remodel your home, our expert team’s here to help. Let’s work together to create the home of your dreams.

  1. Tell us about your home A few details about the house and what you need.
  2. We visit, free of charge We look at the house and the lot and talk through the options.
  3. You get a design and a budget Drawn and priced by the same team that will build it.
Prefer to talk?647-277-4577

Request Free Consultation

    We only use your details to reply to your request. We never share them.

    Get in Touch!

    CallFree Consultation